top of page

Post 4: Front Fuselage Frame-Up! Moving at Lightning Speed.

  • Writer: UL Plans
    UL Plans
  • Apr 19
  • 1 min read

April 18, 2026: Evening


The rear fuse is drying, so I'm jumping straight into the safety cage -- the front fuselage.

Another milestone for today:

1️⃣Cut and planed the main 1"x2" Douglas Fir sticks

2️⃣Laid them out directly onto my 1:1 full size plans

3️⃣Precision-cut the birch ply gussets


Tonight the glue-fest continues as I epoxy the first side-frame. By morning the cabin of the Canyon Lightning™ will be a reality!


The 1"x2" logic:

While the tail is 1" for weight, the cabin uses beefy 1" x 2" sticks. This creates a massive structural hard point for the Polini Thor 303 mount, the wing spars, and the landing gear. It's light where it can be and bulletproof where it has to be.


Thanks for joining the ride! The "under $2000" goal is looking better every day 🛫✈


Follow me for daily updates!



Comments


bottom of page